First unit of Belarusian nuclear power plant to be fully commissioned in Q1 2021"Startup and commissioning operations are being completed on all the systems. The operations are required for the physical launch of the first unit. During this stage 163 fuel rod arrays will be gradually placed inside the reactor and after that the reactor unit will gradually increase output"...