Official Website of the Republic of Belarus
Business
Belarus Events Calendar
Belarus’ Top Tourist Sites
UNESCO World Heritage Sites in Belarus
Belarusian sanatoria and health resorts
Souvenirs from Belarus
| Home | Business | Business news

Business news

25 Nov 2020

Construction of peaking plants begins at Minsk cogeneration plant No.5

Construction of peaking plants begins at Minsk cogeneration plant No.5
An archive photo

MINSK, 25 November (BelTA) – The construction of peaking and load-following power plants powered by Siemens gas turbine power units has begun at cogeneration plant No.5 in Minsk, the press service of the national energy company Belenergo told BelTA.

New peaking and load-following power plants are being built as part of the integration of the Belarusian nuclear power plant into the country’s power grid. The new sources of energy will have to smooth out electric consumption spikes and will go online fast to ensure the uninterrupted supply of electricity to consumers if baseload power plants go offline.

The backup sources of energy rely on quick-acting gas-turbine power units that can reach their designed output capacity within 15 minutes from a cold start.

The construction of the first set of peaking and load-following power plants has begun. A total of six gas-turbine power units with the total output capacity of 300MW will be built.

Archive
Su Mo Tu We Th Fr Sa
Great Patriotic War monuments in Belarus